Over the following years the barbed wire and mesh barrier that was constructed overnight was gradually replaced with a virtually impregnable ring of reinforced concrete that ran 155km around West Berlin.
- Categories: Podcast
Over the following years the barbed wire and mesh barrier that was constructed overnight was gradually replaced with a virtually impregnable ring of reinforced concrete that ran 155km around West Berlin.
28th June 2015
11th November 2025
14th October 2026
12th October 2026
11th November 2025
1st September 2018
9th November 2019