Over the following years the barbed wire and mesh barrier that was constructed overnight was gradually replaced with a virtually impregnable ring of reinforced concrete that ran 155km around West Berlin.
- Categories: Podcast
Over the following years the barbed wire and mesh barrier that was constructed overnight was gradually replaced with a virtually impregnable ring of reinforced concrete that ran 155km around West Berlin.
28th June 2015
11th November 2022
11th November 2022
9th November 2019